Before terminating usage at the project level, consider controlling costs or limiting consumption by API. If none of those options fit the bill, here are a couple of ways.
Disable billing
- Disabling billing maintains the project but prevents any new use of project APIs or resources
Shut down your project
- Shutting down a project releases all resources used within the project
- Only project owners can shut down or restore projects
Comments
0 comments
Please sign in to leave a comment.